AMI · Film 23 of 35

AMI readiness beyond the meter

Inspect objectives, field estate, communications, software, integration, cybersecurity and acceptance together.

0:39runtime3chapters2learning lenses
AMI · Film 23 / 35

AMI readiness beyond the meter

Inspect objectives, field estate, communications, software, integration, cybersecurity and acceptance together.

CHOOSE YOUR VIEW
AMI

Engineering lens

Trace the physical architecture, interfaces, data or energy flow, and the evidence required before design or configuration.

  1. 01What enters and leaves each system boundary?
  2. 02Which interface creates the greatest technical uncertainty?
  3. 03What drawing, data or test would confirm the assumption?
CONNECTED LEARNING

Do not stop at the film.

Use the next resource to inspect the architecture, evidence, readiness or project action behind this explanation.

Continue into the lesson ↗Submit an AMI requirement
SEARCHABLE TRANSCRIPT

Find the term, then return to the explanation.

Enter a technical term to search this lesson.

Loading transcript…