AMI · Film 23 of 35
AMI readiness beyond the meter
Inspect objectives, field estate, communications, software, integration, cybersecurity and acceptance together.
0:39runtime3chapters2learning lenses
AMI · Film 23 / 35AMI readiness beyond the meter
Inspect objectives, field estate, communications, software, integration, cybersecurity and acceptance together.
CHOOSE YOUR VIEWAMIEngineering lens
Trace the physical architecture, interfaces, data or energy flow, and the evidence required before design or configuration.
- 01What enters and leaves each system boundary?
- 02Which interface creates the greatest technical uncertainty?
- 03What drawing, data or test would confirm the assumption?