AMI · Film 08 of 35
A smart meter is only the beginning
Follow the complete AMI chain from field measurement to communications, HES, MDMS and utility action.
0:42runtime3chapters2learning lenses
AMI · Film 08 / 35A smart meter is only the beginning
Follow the complete AMI chain from field measurement to communications, HES, MDMS and utility action.
CHOOSE YOUR VIEWAMIEngineering lens
Trace the physical architecture, interfaces, data or energy flow, and the evidence required before design or configuration.
- 01What enters and leaves each system boundary?
- 02Which interface creates the greatest technical uncertainty?
- 03What drawing, data or test would confirm the assumption?
Enter a technical term to search this lesson.
Loading transcript…