Enter project evidence
Every field explains what is needed and why it matters.
Advanced planning after context
Choose a system, answer only what you know, and receive a preliminary direction that explains its assumptions, missing evidence and responsible next action.
Guided Mode explains one decision at a time. Professional Mode provides compact technical inputs and controlled briefs.
Use known project evidence, leave unknowns blank, and carry the complete assumptions and gaps into a Metro Power review.
Test connected demand, managed simultaneity and site-value evidence maturity. This does not replace interval-load analysis or electrical design.
Entering a number does not verify it. Record the controlling evidence for both site values.
A battery should not be sized until its required operating result and controlling evidence are defined.
Record whether each input is unavailable, identified, documented or verified. The decision gate advances from evidence maturity—not the number of selected categories.
Define the service problem and installation context before discussing meter technology or communications.
Use Documented only when a current record exists; use Verified only after its source and revision have been checked.
Start with what the utility needs to improve. Select only the conditions, systems and measurable results that genuinely matter. Leaving an area blank is acceptable; the result will identify it as a gap.
The Lab returns a usable preliminary conclusion, not a product recommendation, final design or approval.
Every field explains what is needed and why it matters.
Results connect inputs to likely constraints and dependencies.
Every output separates facts, assumptions and missing evidence.
Download a brief or carry the full result into Metro Power review.