Project decisions · Film 35 of 35

Start with the real requirement

Describe the operating need, site, evidence and controlling documents before accepting the first equipment answer.

0:44runtime3chapters2learning lenses
Project decisions · Film 35 / 35

Start with the real requirement

Describe the operating need, site, evidence and controlling documents before accepting the first equipment answer.

CHOOSE YOUR VIEW
Project decisions

Engineering lens

Trace the physical architecture, interfaces, data or energy flow, and the evidence required before design or configuration.

  1. 01What enters and leaves each system boundary?
  2. 02Which interface creates the greatest technical uncertainty?
  3. 03What drawing, data or test would confirm the assumption?
CONNECTED LEARNING

Do not stop at the film.

Use the next resource to inspect the architecture, evidence, readiness or project action behind this explanation.

Continue into the lesson ↗Start a Metro Power request
SEARCHABLE TRANSCRIPT

Find the term, then return to the explanation.

Enter a technical term to search this lesson.

Loading transcript…