Proof & delivery · Film 31 of 35
Delivery should leave an operating record
Connect technical review, production, logistics, installation, commissioning and acceptance evidence.
0:37runtime3chapters2learning lenses
Proof & delivery · Film 31 / 35Delivery should leave an operating record
Connect technical review, production, logistics, installation, commissioning and acceptance evidence.
CHOOSE YOUR VIEWProof & deliveryEngineering lens
Trace the physical architecture, interfaces, data or energy flow, and the evidence required before design or configuration.
- 01What enters and leaves each system boundary?
- 02Which interface creates the greatest technical uncertainty?
- 03What drawing, data or test would confirm the assumption?
Enter a technical term to search this lesson.
Loading transcript…