Proof & delivery · Film 31 of 35

Delivery should leave an operating record

Connect technical review, production, logistics, installation, commissioning and acceptance evidence.

0:37runtime3chapters2learning lenses
Proof & delivery · Film 31 / 35

Delivery should leave an operating record

Connect technical review, production, logistics, installation, commissioning and acceptance evidence.

CHOOSE YOUR VIEW
Proof & delivery

Engineering lens

Trace the physical architecture, interfaces, data or energy flow, and the evidence required before design or configuration.

  1. 01What enters and leaves each system boundary?
  2. 02Which interface creates the greatest technical uncertainty?
  3. 03What drawing, data or test would confirm the assumption?
CONNECTED LEARNING

Do not stop at the film.

Use the next resource to inspect the architecture, evidence, readiness or project action behind this explanation.

Continue into the lesson ↗See the delivery framework
SEARCHABLE TRANSCRIPT

Find the term, then return to the explanation.

Enter a technical term to search this lesson.

Loading transcript…