Water metering · Film 26 of 35

Test water hydraulic readiness

Record pipe, pressure, flow, water condition, zones and response workflows before connected-meter selection.

0:41runtime3chapters2learning lenses
Water metering · Film 26 / 35

Test water hydraulic readiness

Record pipe, pressure, flow, water condition, zones and response workflows before connected-meter selection.

CHOOSE YOUR VIEW
Water metering

Engineering lens

Trace the physical architecture, interfaces, data or energy flow, and the evidence required before design or configuration.

  1. 01What enters and leaves each system boundary?
  2. 02Which interface creates the greatest technical uncertainty?
  3. 03What drawing, data or test would confirm the assumption?
CONNECTED LEARNING

Do not stop at the film.

Use the next resource to inspect the architecture, evidence, readiness or project action behind this explanation.

Continue into the lesson ↗Open the water checklist