Electric Metering & AMI

TA35 Series

Single-phase smart/prepayment meter

Smart meter with tariff, DLMS and optional dual-circuit functions.

01DLMS protocol02Multiple interfaces03STS prepayment
EVIDENCE STATUSProfile-backedThe product is shown as a project starting point. Exact ratings, interfaces, approvals, availability and evidence must be confirmed for the selected configuration.
TA35 Series, Studio viewFIDELITY-SAFE · CONTROLLED STUDIO
PRODUCT STUDIOTA35 SeriesFaithful product presentation using the current approved visual source.
VISUAL SOURCEFidelity-safe studio treatmentProduct appearance supports identification only. Ratings, dimensions, interfaces and compliance remain document-controlled.

A credible meter decision needs more than a polished front view.

This AMI and conventional-meter package defines the minimum evidence chain Metro Power should assemble for the exact unit before technical or commercial release.

01IDENTITY

Front, nameplate and model identity matched to the offered unit

02FIT

Service form, voltage, current class, wiring and installation arrangement

03INTERFACES

Terminal, communications, relay, optical and accessory evidence as applicable

04AUTHORITY

Controlled datasheet, drawing, certificates and principal confirmation

05PROJECT RELEASE

TOR matrix, approved configuration, test evidence and offer revision aligned

What the current reference supports.

Open each documented fact for its responsible interpretation. These facts help determine whether the product deserves further review; they are not a complete compliance matrix or project approval.

01DLMS protocol+

This fact is supported at the displayed evidence level. Confirm the exact model code, option, revision and controlling TOR before using it in a compliance statement, offer or installation decision.

02Multiple interfaces+

This fact is supported at the displayed evidence level. Confirm the exact model code, option, revision and controlling TOR before using it in a compliance statement, offer or installation decision.

03STS prepayment+

This fact is supported at the displayed evidence level. Confirm the exact model code, option, revision and controlling TOR before using it in a compliance statement, offer or installation decision.

04G3 Alliance certified+

This fact is supported at the displayed evidence level. Confirm the exact model code, option, revision and controlling TOR before using it in a compliance statement, offer or installation decision.

One product identity. Five controlled evidence gates.

This schedule shows what the public record supports and what Metro Power must still match before the product becomes a technical or commercial commitment.

ControlCurrent public recordProject release requirementStatus
IdentityTA35 Series · Single-phase smart/prepayment meterExact model code, production revision and option scheduleProfile-backed
ApplicationSmart meter with tariff, DLMS and optional dual-circuit functions.Approved service, duty, site and operating useApplication review
Technical factsDLMS protocol · Multiple interfaces · STS prepayment · G3 Alliance certifiedControlled datasheet and requirement-by-requirement compliance matrixConfiguration check
InterfacesControlling TOR and meter population · Service type, voltage, form and class · Pilot geography and communications studyDrawings, terminals, communications, accessories and system interfacesEvidence required
Approval and supplyBilling/CIS integration requirements · Cybersecurity and data rules · Success measures and rollout gateCurrent certificates, test records, principal confirmation, availability and deliveryRelease before offer

An image starts identification. Controlled evidence completes selection.

01

System relationship

Review how this equipment relates to the complete architecture, interfaces and operating outcome.

Open system context ↗
02

Dimensions & interfaces

Request the controlled outline drawing, terminals, mounting and accessory schedule for the selected configuration.

Request dimensional evidence ↗
03

Configuration authority

Match the product image, model code, datasheet, compliance matrix and offer before release.

Review evidence gates ↑

Where this product family may enter the system.

Application fit depends on the exact service, duty, operating objective and approved configuration. Use these as discovery prompts, not automatic recommendations.

01Automated billing reads
02Loss analysis
03Load profiling
04Outage and event visibility
05Remote service operations where enabled
06Phased utility modernization

What must be confirmed before an offer.

Exact form, class, voltage, current, relay, protocol, communications, certification and firmware are confirmed in a project compliance matrix.

Understand the complete system architecture ↗
  1. 01Controlling TOR and meter population
  2. 02Service type, voltage, form and class
  3. 03Pilot geography and communications study
  4. 04Billing/CIS integration requirements
  5. 05Cybersecurity and data rules
  6. 06Success measures and rollout gate

From product interest to a controlled offer.

01

Requirement

Confirm the operating need, service, site and controlling specification.

02

Configuration

Match ratings, options, communications, interfaces and accessories.

03

Evidence

Check datasheet revision, compliance, certificates and confirmation gaps.

04

Offer gate

Release price and delivery only against the approved configuration.

CONTROLLED DOCUMENT REQUEST

Need the current datasheet or compliance evidence?

Metro Power will match the document revision, model and configuration to your requirement before release. Tell us the decision, TOR or application the document must support.

Request controlled documents ↗