Front, nameplate and model identity matched to the offered unit
Electric Metering & AMI
NA63 Series
Three-phase smart meter
Advanced three-phase platform for richer data and analysis.
FIDELITY-SAFE · CONTROLLED STUDIOA credible meter decision needs more than a polished front view.
This AMI and conventional-meter package defines the minimum evidence chain Metro Power should assemble for the exact unit before technical or commercial release.
Service form, voltage, current class, wiring and installation arrangement
Terminal, communications, relay, optical and accessory evidence as applicable
Controlled datasheet, drawing, certificates and principal confirmation
TOR matrix, approved configuration, test evidence and offer revision aligned
What the current reference supports.
Open each documented fact for its responsible interpretation. These facts help determine whether the product deserves further review; they are not a complete compliance matrix or project approval.
01Large storage+
This fact is supported at the displayed evidence level. Confirm the exact model code, option, revision and controlling TOR before using it in a compliance statement, offer or installation decision.
02Multiple interfaces+
This fact is supported at the displayed evidence level. Confirm the exact model code, option, revision and controlling TOR before using it in a compliance statement, offer or installation decision.
03Split STS prepayment+
This fact is supported at the displayed evidence level. Confirm the exact model code, option, revision and controlling TOR before using it in a compliance statement, offer or installation decision.
04Power-quality analysis+
This fact is supported at the displayed evidence level. Confirm the exact model code, option, revision and controlling TOR before using it in a compliance statement, offer or installation decision.
One product identity. Five controlled evidence gates.
This schedule shows what the public record supports and what Metro Power must still match before the product becomes a technical or commercial commitment.
An image starts identification. Controlled evidence completes selection.
Where this product family may enter the system.
Application fit depends on the exact service, duty, operating objective and approved configuration. Use these as discovery prompts, not automatic recommendations.
What must be confirmed before an offer.
Exact form, class, voltage, current, relay, protocol, communications, certification and firmware are confirmed in a project compliance matrix.
Understand the complete system architecture ↗- 01Controlling TOR and meter population
- 02Service type, voltage, form and class
- 03Pilot geography and communications study
- 04Billing/CIS integration requirements
- 05Cybersecurity and data rules
- 06Success measures and rollout gate
From product interest to a controlled offer.
Requirement
Confirm the operating need, service, site and controlling specification.
Configuration
Match ratings, options, communications, interfaces and accessories.
Evidence
Check datasheet revision, compliance, certificates and confirmation gaps.
Offer gate
Release price and delivery only against the approved configuration.
Need the current datasheet or compliance evidence?
Metro Power will match the document revision, model and configuration to your requirement before release. Tell us the decision, TOR or application the document must support.