Electric Metering & AMI

NA61

Smart meter

Current Metro Power brochure-backed smart-meter platform.

01Project-specific electrical configuration02Communications confirmed against TOR03Factory compliance review before offer
EVIDENCE STATUSBrochure-backedThe product is shown as a project starting point. Exact ratings, interfaces, approvals, availability and evidence must be confirmed for the selected configuration.
NA61, Studio view
PRODUCT STUDIONA61Faithful product presentation using the current approved visual source.
VISUAL SOURCESystem visualProduct appearance supports identification only. Ratings, dimensions, interfaces and compliance remain document-controlled.

A credible meter decision needs more than a polished front view.

This AMI and conventional-meter package defines the minimum evidence chain Metro Power should assemble for the exact unit before technical or commercial release.

01IDENTITY

Front, nameplate and model identity matched to the offered unit

02FIT

Service form, voltage, current class, wiring and installation arrangement

03INTERFACES

Terminal, communications, relay, optical and accessory evidence as applicable

04AUTHORITY

Controlled datasheet, drawing, certificates and principal confirmation

05PROJECT RELEASE

TOR matrix, approved configuration, test evidence and offer revision aligned

What the current reference supports.

Open each documented fact for its responsible interpretation. These facts help determine whether the product deserves further review; they are not a complete compliance matrix or project approval.

01Project-specific electrical configuration+

This fact is supported at the displayed evidence level. Confirm the exact model code, option, revision and controlling TOR before using it in a compliance statement, offer or installation decision.

02Communications confirmed against TOR+

This fact is supported at the displayed evidence level. Confirm the exact model code, option, revision and controlling TOR before using it in a compliance statement, offer or installation decision.

03Factory compliance review before offer+

This fact is supported at the displayed evidence level. Confirm the exact model code, option, revision and controlling TOR before using it in a compliance statement, offer or installation decision.

One product identity. Five controlled evidence gates.

This schedule shows what the public record supports and what Metro Power must still match before the product becomes a technical or commercial commitment.

ControlCurrent public recordProject release requirementStatus
IdentityNA61 · Smart meterExact model code, production revision and option scheduleBrochure-backed
ApplicationCurrent Metro Power brochure-backed smart-meter platform.Approved service, duty, site and operating useApplication review
Technical factsProject-specific electrical configuration · Communications confirmed against TOR · Factory compliance review before offerControlled datasheet and requirement-by-requirement compliance matrixConfiguration check
InterfacesControlling TOR and meter population · Service type, voltage, form and class · Pilot geography and communications studyDrawings, terminals, communications, accessories and system interfacesEvidence required
Approval and supplyBilling/CIS integration requirements · Cybersecurity and data rules · Success measures and rollout gateCurrent certificates, test records, principal confirmation, availability and deliveryRelease before offer

An image starts identification. Controlled evidence completes selection.

01

System relationship

Review how this equipment relates to the complete architecture, interfaces and operating outcome.

Open system context ↗
02

Dimensions & interfaces

Request the controlled outline drawing, terminals, mounting and accessory schedule for the selected configuration.

Request dimensional evidence ↗
03

Configuration authority

Match the product image, model code, datasheet, compliance matrix and offer before release.

Review evidence gates ↑

Where this product family may enter the system.

Application fit depends on the exact service, duty, operating objective and approved configuration. Use these as discovery prompts, not automatic recommendations.

01Automated billing reads
02Loss analysis
03Load profiling
04Outage and event visibility
05Remote service operations where enabled
06Phased utility modernization

What must be confirmed before an offer.

Exact form, class, voltage, current, relay, protocol, communications, certification and firmware are confirmed in a project compliance matrix.

Understand the complete system architecture ↗
  1. 01Controlling TOR and meter population
  2. 02Service type, voltage, form and class
  3. 03Pilot geography and communications study
  4. 04Billing/CIS integration requirements
  5. 05Cybersecurity and data rules
  6. 06Success measures and rollout gate

From product interest to a controlled offer.

01

Requirement

Confirm the operating need, service, site and controlling specification.

02

Configuration

Match ratings, options, communications, interfaces and accessories.

03

Evidence

Check datasheet revision, compliance, certificates and confirmation gaps.

04

Offer gate

Release price and delivery only against the approved configuration.

CONTROLLED DOCUMENT REQUEST

Need the current datasheet or compliance evidence?

Metro Power will match the document revision, model and configuration to your requirement before release. Tell us the decision, TOR or application the document must support.

Request controlled documents ↗