BESS & Microgrids

BSC-CTC-5000K0000K

PCS and medium-voltage station

Containerized power conversion system (PCS), the equipment that converts battery DC to grid AC, with a step-up transformer to 10, 20 or 35 kV. Published by Bescore as the CTC-5000 and paired with the CS3-5000 battery container.

POSSIBLE USEUtility-scale storage connected at medium voltageA starting point for discussion, not an automatic recommendation.
WHAT WE CAN CONFIRM TODAYTechnical sheet availablePublished technical details are available. Metro Power will still confirm the exact model and project configuration.
FIRST PROJECT CHECK12 months of bills and tariffIf you do not know this yet, Metro Power can help identify what is needed.
BSC-CTC-5000K0000K, Studio view
PRODUCT STUDIOBSC-CTC-5000K0000KProduct image from the available source. Confirm the exact model, ratings, dimensions and interfaces by document.
IMAGE REFERENCEManufacturer product renderThis image supports product identification. Metro Power confirms ratings, dimensions, interfaces and compliance using the applicable documents.
BESS & Microgrids

BSC-CTC-5000K0000KPCS and medium-voltage station

01
1,725, 2,500, 3,450 or 5,000 kW rated power (BSC-CTC-1725K0000K to BSC-CTC-5000K0000K)
02
Rated 50 Hz as published by Bescore; a 60 Hz version for the Philippine grid is not yet confirmed
03
1,000 to 1,500 V DC input; 10/20/35 kV output; 2,000 to 5,500 kVA transformer

Figures as the principal publishes them. Product image for identification, not an installation.

BSC-CTC-5000K0000K, product image in monochrome

What the storage system connects to.

A battery only earns its place through the equipment around it: the supply it charges from, the switchgear that isolates it, the loads it protects and the sources a controller must coordinate.

Evening view of containerized battery storage beside switchgear and a transformer
Illustrative setting Not a Metro Power installation or project record.

Power path

  1. Utility gridAbsent on an off-grid site.
  2. TransformerService transformer, or an isolation transformer for an island.
  3. Switchgear and transfer deviceIsolates the system and moves the site between grid and island.
  4. This productBSC-CTC-5000K0000KStores energy as DC and delivers it through the PCS.
  5. Site loadsCritical loads first when the battery is the only source.

Other sources the controller coordinates

  1. SolarCharges the battery or serves load directly.
  2. Diesel generatorBackup, or the second source on an island.
  3. From the BSC-CTC-5000K0000KDispatch rules decide which source serves which load.
PowerReal product photographDrawn: equipment Metro Power does not supply
Options and differences

From pack to power station, as the principal publishes them

Storage is built in steps. Each step adds energy, voltage and the equipment needed to connect it.

  • Battery pack

    14 kWh at 51.2 V DC. The building block.

  • Battery rack

    215 kWh at 768 V DC. Packs in series, fitted inside an enclosure.

  • Cabinet system

    105 kW with 215 kWh. Battery, PCS and controls in one outdoor cabinet.

  • Battery compartment

    Up to 5,016 kWh at 1,331.2 V DC. DC only; converts in a separate station.

  • This productPCS and MV station

    Up to 5,000 kW, stepped up to 10, 20 or 35 kV.

What the current reference supports.

These facts help determine whether the product deserves further review. They are not a complete compliance matrix or project approval.

01 1,725, 2,500, 3,450 or 5,000 kW rated power (BSC-CTC-1725K0000K to BSC-CTC-5000K0000K)
02 Rated 50 Hz as published by Bescore; a 60 Hz version for the Philippine grid is not yet confirmed
03 1,000 to 1,500 V DC input; 10/20/35 kV output; 2,000 to 5,500 kVA transformer
04 IEC 61850, Modbus RTU/TCP, EtherCAT and CAN interfaces; IP54

Each fact is supported at the evidence level shown above (technical sheet available). Confirm the exact model code, option, revision and controlling terms of reference (TOR) before using any fact in a compliance statement, offer or installation decision.

What is inside the BSC-CTC-5000K0000K.

The blocks, the power path and the four signal buses, redrawn from the principal's published circuit diagram. It shows arrangement, not wiring; installation follows the controlled drawings.

Arrangement drawing

Inside the CTC-5000 PCS and medium-voltage station

Redrawn by Metro Power from the single-line diagram in the CTC-5000 datasheet Bescore publishes. Principal's published figures.
BATTERY COMPARTMENT 1BATTERY COMPARTMENT 42 AND 3PCS-MV STATIONPCS 1PCS 4AC 0.69 kVSTEP-UP TRANSFORMERRMUGRID10, 20 OR 35 kV LOCAL CONTROLLEREMSOUTSIDETHE STATIONLIGHTINGTEMPERATUREFIRE
How to read it
  1. Up to four battery compartments each feed their own PCS. The PCS outputs join one 0.69 kV AC bus.
  2. One step-up transformer and a ring main unit (RMU) connect the station to the grid at 10, 20 or 35 kV.
  3. A local controller runs the station; the plant energy management system sits outside it.
  4. The compartments are shown with the principal's product render of the CS3-5000.
Key
  • DC power
  • AC power
  • Energy flow, shown when motion is allowed
  • Control and communication

Metro Power supplies the switchgear and distribution transformers that fill equivalent positions on other projects. Rated 50 Hz as published by Bescore; a 60 Hz version is not yet confirmed.

One product identity. Five controlled evidence gates.

This schedule shows what the public record supports and what Metro Power must still match before the product becomes a technical or commercial commitment.

ControlCurrent public recordProject release requirementStatus
IdentityBSC-CTC-5000K0000K · PCS and medium-voltage stationExact model code, production revision and option scheduleTechnical sheet available
ApplicationContainerized power conversion system (PCS), the equipment that converts battery DC to grid AC, with a step-up transformer to 10, 20 or 35 kV. Published by Bescore as the CTC-5000 and paired with the CS3-5000 battery container.Approved service, duty, site and operating useApplication review
Technical facts1,725, 2,500, 3,450 or 5,000 kW rated power (BSC-CTC-1725K0000K to BSC-CTC-5000K0000K) · Rated 50 Hz as published by Bescore; a 60 Hz version for the Philippine grid is not yet confirmed · 1,000 to 1,500 V DC input; 10/20/35 kV output; 2,000 to 5,500 kVA transformer · IEC 61850, Modbus RTU/TCP, EtherCAT and CAN interfaces; IP54Controlled datasheet and requirement-by-requirement compliance matrixConfiguration check
Information to prepare12 months of bills and tariff · Interval load data · Critical loads and outage history · Solar/generator details · Single-line and transformer data · Site, fire and interconnection constraints · Service voltage and frequency (the Philippine grid is 60 Hz) · Existing solar: inverter make, rating and how it connects · The largest motor that must start in an island, with its starting current · Distance to the coast and exposure to salt airDrawings, terminals, communications, accessories and system interfacesEvidence required
Approval and supplyNot shown on this pageCurrent certificates, test records, principal confirmation, availability and deliveryRelease before offer

An image starts identification. Controlled evidence completes selection.

01

System relationship

Review how this equipment relates to the complete architecture, interfaces and operating outcome.

Open system context ↗
03

Configuration authority

Match the product image, model code, datasheet, compliance matrix and offer before release.

Review evidence gates ↑

Where this product family may enter the system.

Application fit depends on the exact service, duty, operating objective and approved configuration. Use these as discovery prompts, not automatic recommendations.

01Peak shaving
02Solar self-consumption
03Critical-load backup
04Diesel optimization
05Renewable smoothing
06Grid-tied storage on a constrained feeder

What must be confirmed before an offer.

Capacity, savings and backup duration require validated interval load, site and operating data; monthly consumption alone is insufficient. Frequency, service voltage and the largest motor to be started are confirmed before any model is proposed.

Understand the complete system architecture ↗
  1. 0112 months of bills and tariff
  2. 02Interval load data
  3. 03Critical loads and outage history
  4. 04Solar/generator details
  5. 05Single-line and transformer data
  6. 06Site, fire and interconnection constraints

From product interest to a controlled offer.

01

Requirement

Confirm the operating need, service, site and controlling specification.

02

Configuration

Match ratings, options, communications, interfaces and accessories.

03

Evidence

Check datasheet revision, compliance, certificates and confirmation gaps.

04

Offer gate

Release price and delivery only against the approved configuration.