EV Charging Infrastructure

22kW / dual 22kW

AC destination charger

For homes, workplaces, hotels and longer-dwell parking.

01Site circuit must be checked02Vehicle AC acceptance affects speed03Cloud options by model
EVIDENCE STATUSProduct material availableProduct information is available, but exact configuration, certification and project fit must be confirmed before it becomes an offer commitment.
22kW / dual 22kW, Studio viewFIDELITY-SAFE · CONTROLLED STUDIO
PRODUCT STUDIO22kW / dual 22kWFaithful product presentation using the current approved visual source.
VISUAL SOURCEFidelity-safe studio treatmentProduct appearance supports identification only. Ratings, dimensions, interfaces and compliance remain document-controlled.

What the current reference supports.

Open each documented fact for its responsible interpretation. These facts help determine whether the product deserves further review; they are not a complete compliance matrix or project approval.

01Site circuit must be checked+

This fact is supported at the displayed evidence level. Confirm the exact model code, option, revision and controlling TOR before using it in a compliance statement, offer or installation decision.

02Vehicle AC acceptance affects speed+

This fact is supported at the displayed evidence level. Confirm the exact model code, option, revision and controlling TOR before using it in a compliance statement, offer or installation decision.

03Cloud options by model+

This fact is supported at the displayed evidence level. Confirm the exact model code, option, revision and controlling TOR before using it in a compliance statement, offer or installation decision.

One product identity. Five controlled evidence gates.

This schedule shows what the public record supports and what Metro Power must still match before the product becomes a technical or commercial commitment.

ControlCurrent public recordProject release requirementStatus
Identity22kW / dual 22kW · AC destination chargerExact model code, production revision and option scheduleProduct material available
ApplicationFor homes, workplaces, hotels and longer-dwell parking.Approved service, duty, site and operating useApplication review
Technical factsSite circuit must be checked · Vehicle AC acceptance affects speed · Cloud options by modelControlled datasheet and requirement-by-requirement compliance matrixConfiguration check
InterfacesVehicle mix and demand · Dwell time and turnaround · Transformer/service capacityDrawings, terminals, communications, accessories and system interfacesEvidence required
Approval and supplySingle-line and load profile · Parking, trenching and cable routes · Permits, payment and operating modelCurrent certificates, test records, principal confirmation, availability and deliveryRelease before offer

An image starts identification. Controlled evidence completes selection.

01

System relationship

Review how this equipment relates to the complete architecture, interfaces and operating outcome.

Open system context ↗
02

Dimensions & interfaces

Request the controlled outline drawing, terminals, mounting and accessory schedule for the selected configuration.

Request dimensional evidence ↗
03

Configuration authority

Match the product image, model code, datasheet, compliance matrix and offer before release.

Review evidence gates ↑

Where this product family may enter the system.

Application fit depends on the exact service, duty, operating objective and approved configuration. Use these as discovery prompts, not automatic recommendations.

01Home and condominium
02Workplace/destination
03Fleet depots
04Cooperative charging hubs
05Highway/public fast charging
06Retail and mixed use

What must be confirmed before an offer.

Transformer upgrades, cabling, switchgear, protection, civil works, permits and demand charges may outweigh charger cost; Metro Power evaluates the whole site.

Understand the complete system architecture ↗
  1. 01Vehicle mix and demand
  2. 02Dwell time and turnaround
  3. 03Transformer/service capacity
  4. 04Single-line and load profile
  5. 05Parking, trenching and cable routes
  6. 06Permits, payment and operating model

From product interest to a controlled offer.

01

Requirement

Confirm the operating need, service, site and controlling specification.

02

Configuration

Match ratings, options, communications, interfaces and accessories.

03

Evidence

Check datasheet revision, compliance, certificates and confirmation gaps.

04

Offer gate

Release price and delivery only against the approved configuration.

CONTROLLED DOCUMENT REQUEST

Need the current datasheet or compliance evidence?

Metro Power will match the document revision, model and configuration to your requirement before release. Tell us the decision, TOR or application the document must support.

Request controlled documents ↗