EV Charging Infrastructure

22 kW / dual 22 kW

AC destination charger

For homes, workplaces, hotels and longer-dwell parking.

POSSIBLE USEHomes, workplaces, hotels and other longer-stay parkingA starting point for discussion, not an automatic recommendation.
WHAT WE CAN CONFIRM TODAYProduct reference availableProduct information is available, but site conditions and the selected configuration still determine fit.
FIRST PROJECT CHECKVehicle mix and demandIf you do not know this yet, Metro Power can help identify what is needed.
22 kW / dual 22 kW, Studio viewPRODUCT IMAGE · REFERENCE VIEW
PRODUCT STUDIO22 kW / dual 22 kWProduct image from the available source. Confirm the exact model, ratings, dimensions and interfaces by document.
IMAGE REFERENCEProduct reference imageThis image supports product identification. Metro Power confirms ratings, dimensions, interfaces and compliance using the applicable documents.

What the current reference supports.

These facts help determine whether the product deserves further review. They are not a complete compliance matrix or project approval.

01 Site circuit must be checked
02 Vehicle AC acceptance affects speed
03 Cloud options by model

Each fact is supported at the evidence level shown above (product reference available). Confirm the exact model code, option, revision and controlling terms of reference (TOR) before using any fact in a compliance statement, offer or installation decision.

One product identity. Five controlled evidence gates.

This schedule shows what the public record supports and what Metro Power must still match before the product becomes a technical or commercial commitment.

ControlCurrent public recordProject release requirementStatus
Identity22 kW / dual 22 kW · AC destination chargerExact model code, production revision and option scheduleProduct reference available
ApplicationFor homes, workplaces, hotels and longer-dwell parking.Approved service, duty, site and operating useApplication review
Technical factsSite circuit must be checked · Vehicle AC acceptance affects speed · Cloud options by modelControlled datasheet and requirement-by-requirement compliance matrixConfiguration check
Information to prepareVehicle mix and demand · Dwell time and turnaround · Transformer/service capacity · Single-line and load profile · Parking, trenching and cable routes · Permits, payment and operating modelDrawings, terminals, communications, accessories and system interfacesEvidence required
Approval and supplyNot shown on this pageCurrent certificates, test records, principal confirmation, availability and deliveryRelease before offer

An image starts identification. Controlled evidence completes selection.

01

System relationship

Review how this equipment relates to the complete architecture, interfaces and operating outcome.

Open system context ↗
03

Configuration authority

Match the product image, model code, datasheet, compliance matrix and offer before release.

Review evidence gates ↑

Where this product family may enter the system.

Application fit depends on the exact service, duty, operating objective and approved configuration. Use these as discovery prompts, not automatic recommendations.

01Home and condominium
02Workplace/destination
03Fleet depots
04Cooperative charging hubs
05Highway/public fast charging
06Retail and mixed use

What must be confirmed before an offer.

Transformer upgrades, cabling, switchgear, protection, civil works, permits and demand charges may outweigh charger cost; Metro Power evaluates the whole site.

Understand the complete system architecture ↗
  1. 01Vehicle mix and demand
  2. 02Dwell time and turnaround
  3. 03Transformer/service capacity
  4. 04Single-line and load profile
  5. 05Parking, trenching and cable routes
  6. 06Permits, payment and operating model

From product interest to a controlled offer.

01

Requirement

Confirm the operating need, service, site and controlling specification.

02

Configuration

Match ratings, options, communications, interfaces and accessories.

03

Evidence

Check datasheet revision, compliance, certificates and confirmation gaps.

04

Offer gate

Release price and delivery only against the approved configuration.

CONTROLLED DOCUMENT REQUEST

Need the current datasheet or compliance evidence?

Metro Power will match the document revision, model and configuration to your requirement before release. Tell us the decision, TOR or application the document must support.

Send a request ↗