EV Charging Infrastructure
22 kW / dual 22 kW
AC destination charger
For homes, workplaces, hotels and longer-dwell parking.
PRODUCT IMAGE · REFERENCE VIEWWhat the current reference supports.
These facts help determine whether the product deserves further review. They are not a complete compliance matrix or project approval.
Each fact is supported at the evidence level shown above (product reference available). Confirm the exact model code, option, revision and controlling terms of reference (TOR) before using any fact in a compliance statement, offer or installation decision.
One product identity. Five controlled evidence gates.
This schedule shows what the public record supports and what Metro Power must still match before the product becomes a technical or commercial commitment.
An image starts identification. Controlled evidence completes selection.
Where this product family may enter the system.
Application fit depends on the exact service, duty, operating objective and approved configuration. Use these as discovery prompts, not automatic recommendations.
What must be confirmed before an offer.
Transformer upgrades, cabling, switchgear, protection, civil works, permits and demand charges may outweigh charger cost; Metro Power evaluates the whole site.
Understand the complete system architecture ↗- 01Vehicle mix and demand
- 02Dwell time and turnaround
- 03Transformer/service capacity
- 04Single-line and load profile
- 05Parking, trenching and cable routes
- 06Permits, payment and operating model
From product interest to a controlled offer.
Requirement
Confirm the operating need, service, site and controlling specification.
Configuration
Match ratings, options, communications, interfaces and accessories.
Evidence
Check datasheet revision, compliance, certificates and confirmation gaps.
Offer gate
Release price and delivery only against the approved configuration.
Need the current datasheet or compliance evidence?
Metro Power will match the document revision, model and configuration to your requirement before release. Tell us the decision, TOR or application the document must support.