SIX CONNECTED CAPABILITIES
Start with the system you need to understand.
See how it works, where it fits, what Metro Power provides and which evidence comes first.
Explore by industry and operating context ↗Open the Readiness & Planning Workspace ↗Enter the A.M.P.E.R.E. workshop ↗01Electric Metering & AMISmart meters, communications, HES and MDMS↗02Conventional MeteringRevenue measurement for every service configuration↗03Water MeteringDigital measurement and network intelligence↗04BESS & MicrogridsStorage, controls, resilience and renewable integration↗05EV ChargingWhole-site charging infrastructure and operations↗06Core Electrical SupplyThe equipment foundation around every system↗
FROM QUESTION TO CONTROLLED REVIEW
Choose the planning depth the decision needs.
Begin with project context, test evidence maturity, then move into system-specific planning or a traceable Metro Power review.
Start with the Project Workspace ↗01Project workspaceDefine the objective, decision, stage and evidence maturity↗02Readiness checkRecord supported signals and expose evidence gaps↗03Advanced planning labTest AMI, BESS, EV and water scenarios responsibly↗04A.M.P.E.R.E.Prepare an electric cooperative for an AMI decision↗05Executive workshopRun the seven-mission facilitated utility journey↗06Controlled reviewSend the result to Metro Power with a traceable reference↗
Metro Power controlled evidence tool
Conventional Metering Checklist
Use before confirming meter and accessory configuration.